Edgbaston
Boundary wall
Our clients required an existing boundary wall to their front elevation to remove a potential health and safety risk.
The client stipulated the wall should look like it did when it was originally built.
Project elements covered:
- Permits obtained for the temporary closure of the pedestrian footpath
- Supply traffic and pedestrian control
- Sympathetically disassembled timber fence for reinstatement at project finish
- Take down existing wall in parts, dress existing brickwork, and rebuild wall to existing design
- Reinstate timber fence
The project involved liaising with;
- Clients surveyors
- Structural engineers
- City council highways department
- Health and Safety consultants
- Local clients' staff, residents and various stakeholders